Documentation for the PXL detector subsystem DOE OPA Review – July 17 – 18, 2012

 

The documentation described and linked here is intended as the primary documentation set for the review of the PXL detector subsystem.  It is primarily intended as a progress update from the CD-2/3 review held in July 2011 at BNL.

Previous documentation sets

A webpage giving the documentation set for the CD–2/3 review may be found at:

http://rnc.lbl.gov/hft/hardware/docs/cd23/

A continuous set of updates can be seen in the monthly reports submitted to DOE. These may be found in eroom on the LBNL website:

https://eroom2.lbl.gov/eroom

 

Sensor

Irradiation test results for the Ultimate 1 (MIMOSA 28) sensor may be found at:

http://rnc.lbl.gov/hft/hardware/docs/ultimate/Ult_rad_tol_2012.pptx

A report on the latch-up testing done for the sensors and components in the high radiation area may be found at:

http://rnc.lbl.gov/hft/hardware/docs/latchup/LU_SEU_2011.pdf

A report on the latch-up environment measured at STAR may be found at:

http://rnc.lbl.gov/hft/hardware/docs/latchup/Latchup_in_PXL_DRAFT.doc

We conducted beam tests at the CERN SPS beam test facility to use a beam telescope constructed from Ultimate 1 sensors and measure the efficiency and accidental rates from the sensors. A report detailing our results may be found at:

http://rnc.lbl.gov/hft/hardware/docs/Ult_sensor_CERN_test_beam_report_1.pdf

 

Cable and Ladder

A draft ladder assembly document may be found here:

http://rnc.lbl.gov/hft/hardware/docs/PXL%20_ladder_assembly.docx

A report on the mechanical dicing and thinning yield for the batch of 11 wafers can be found at:

http://rnc.lbl.gov/hft/hardware/docs/yield_for_11_wafers_2011_12_13.docx

We constructed two ladder prototypes composed of 10 Ultimate 1 sensors each as a test of the ladder cable design, sensors and readout. A testing report may be found at:

http://rnc.lbl.gov/hft/hardware/docs/ultimate/IPHC_ladder_testing_report_1.docx

A schematic, board layout files and stack-up descriptions for the production prototype hybrid cable and driver boards may be found at:

http://rnc.lbl.gov/hft/hardware/docs/ultimate/hybrid_cable_two_power_bus.zip

 

Readout System

We conducted a final RDO architecture internal review on February 6-17, 2012. The presentations can be found at:

http://rnc.lbl.gov/hft/hardware/docs/architecture_meeting_2012_02/index.html

A full set of schematics and board layout files for the production prototype motherboard can be found at:

http://rnc.lbl.gov/hft/hardware/docs/ultimate/PXL_V6_RDO_V1.1.zip

A report on the data cable testing for VHDCI connectors and commercial VHDCI cables for use in the PXL system may be found at:

http://rnc.lbl.gov/hft/hardware/docs/ultimate/VHDCI_and_cable_testing_results.docx

 

Mechanical

For the completion of the Level 2 milestone “L2 CP - PXL Prototype PXL Insertion mechanism Testing Complete” we completed the report which is linked at:

http://rnc.lbl.gov/hft/hardware/docs/ultimate/Completion%20of%20L2%20Milestone%201_2_1_4_1.pdf

A design and test document by Joe Silber on the kinematic mount locking system may be found at:

http://rnc.lbl.gov/hft/hardware/docs/ultimate/2012-04-11%20Design%20for%20Kinematic%20Mounts%20WITH%20SPRING%20CONTACT%20RODS.pdf

A quick FEA analysis by Howard Wieman of the D tube displacement due to hose and air flow pressure in z may be found at:

http://rnc.lbl.gov/hft/hardware/docs/ultimate/D%20tube%20analysis.pptx

 

Infrastructure

We have a draft slow controls document describing the slow control architecture for the PXL system located at:

http://rnc.lbl.gov/hft/hardware/docs/PXL_slow_control_doc_draft.docx

We held an initial BNL safety review for the PXL detector at BNL on September 26, 2011. A website giving the presentations, BNL safety committee report and the PXL group responses may be found at:

http://rnc.lbl.gov/hft/hardware/docs/pxl_bnl_sr/index.html